Roll Off Building
Metal Technologies
Description
We wanted to implement a 3 sided structure to house slag and roll-offs that we use to store bag house dust to reduce environmental effects from wind and rain runoff. I worked with our Project Engineer to review, revise, and contact our structural engineer to ensure the feasibility and utility of this project.
Once we have a Finalized Design, I was responsible for making the project scope and RFQ documents. I contacted several construction companies to gauge their interest in providing quotes based on the RFQ. I was then able to meet with the contractors on site and walk them through the project and answer additional questions that they had in regard to the scope and execution of the design.
Skills Utilized
Research
Planning
Designing
Cost Tracking
Project Management
Project Scope
Request for Quotes
Quotation
Managed Contractors
On-Site Meetings